CMAI - Logo Top
CMAI - Link Top
TESTING CHARGES
 
Testing Charges
W.E.F. 1st November 2009
 
Sr. No.
Test
Minimum Sample Required
No. of Days Required
Test Charges (Rs) Per Sample
Colour Fastness Analysis

1

Col.Fast to Washing

* at 30 / 40 °C

* at 50 / 60 °C

* above 60 °C

* Multifibre Charges


0.5 mtr

1-2 days



110

140

180

45

2

Col.Fast to Rubbing


0.5 mtr

1-2 days

95

3

Col.Fast to Perspiration


0.5 mtr

2 days

250

4

Col.Fast to Water

0.5 mtr
2 days
140

5

Col.Fast to Dry Cleaning

0.5 mtr
1-2 days
240

6

Col.Fast to Saliva

0.5 mtr
2-3 days
315

7

Col.Fast to Chlorine Bleach

0.5 mtr
2 days
185

8

Col.Fast to Non Chlorine Bleach

0.5 mtr
2 days
230

9


Col.Fast to Water Spotting

0.5 mtr
2 days
180

10



Col.Fast to Actual Laundering (after single wash)

1.0 mtr
2-3 days
280

11


Print Security / Durability

1.0 mtr
2-3 days
450

12


Col. Fast to Alkaline Spotting

0.5 mtr
1-2 days
190

13


Col. Fast to Organic Solvent

0.5 mtr
1-2 days
325

14


Col. Fast to Acid Spotting

0.5 mtr
1-2 days
190

15


Col. Fast to Hot Pressing

1.0 mtr
1-2 days
140

16


Col. Fast to Sea Water

0.5 mtr
2 days
190

17


Col. Fast to Chlorinated pool water

0.5 mtr
1-2 days
240

18

Col. Fastness to Light

20 AFU / Grade 4

40 AFU / Grade 5


0.5 mtr

3-5 days


800

1300

19


Col. Fastness to Prespiration & Light

0.5 mtr.
3 days
1200

20


Col. Fastness to Burnt Gas Fumes

0.5 mtr.
3 days
1750
Dimensional Stability (Shrinkage)

21

Shrinkage


* at 30 / 40 °C

* at 50 / 60 °C

* above 60 °C


1.0 mtr







1-2 days










90

170

280

 
Sr. No.
Test
Minimum Sample Required
No. of Days Required
Test Charges (Rs) Per Sample

22


Garment Shrinkage (point to point) One wash


1 garment


1-2 days

330

23


Shrinkage to dry cleaning (Fabric)


1 mtr

2-3 days

250

24


Appearance with Shrinkage after Laundering


2 mtr / 2 grmt

2-3 days

330

25


Appearance after Laundering


2 mtr / 2 grmt


2-3 days

240

26


Appearance after dry cleaning


1 mtr / 2 grmt


2-3 days

575

27


Spirality Test

1.0 mtr

1-2 days

250
Physical Tests

28


Count

* Woven Fabric

* Knitted Fabric

* After removal of added matter

0.5 mtr

1-2 days



130

95

230


29


Construction


0.5 mtr

1-2 days

75

30


Weight


0.5 mtr

1-2 days

100

31


Width


1.0 mtr

1-2 days

90

32


Weight / Liner Meter


1.0 mtr

1-2 days

140

33


Twist Per Yarn Removed from Fabric

0.5 mtr

1-2 days

160

34


Fabric Thickness


0.5 mtr

1-2 days

330

35


Bowing / Skewness of Fabric


1.0 mtr

1-2 days

180

36


Type of Weave


0.5 mtr

2 days

250

37


Crease Recovery angle of Fabric


1.0 mtr

2 days

275

38


Tensile Strength


1.0 mtr

2 days

235

39


Tear Strenght

* Elmendorf Method

* Single Rip Method


1.0 mtr

1-2 days



210

275


40


Bursting Strenght


1.0 mtr

2-3 days

400

41


Pilling Resistance

* ICI Pilling Box

* Martindale Tester upto 5000 rubs


0.5 mtr

2-3 days



275

275


42


Abrasion Resistance

* upto 10,000 rubs

* upto 20,000 rubs

* upto 30,000 rubs


0.5 mtr

2-3 days



275

450

600


43


Seam Slippage


1.0 mtr

2-3 days

280
 
Sr. No.
Test
Minimum Sample Required
No. of Days Required
Test Charges (Rs) Per Sample

44


Absorbency Test ( Water Drop Method )


0.5 mtr

1-2 days

180

45


Length of Yarn Cone


1 cone

1-2 days

180

46


Flammability Test (16 CFR 1610)
(As received & After Washing / Dry Cleaning)


1.5 mtr.

3 days

800
Chemical Parameter Analysis

47

Blend Composition
2 Components
Each additional Components



0.5 mtr
 
 

1-2 days
 
 
 

250
135

48


Scouring of Fabric ( Desizing )


1.0 mtr

2-3 days

275
Towel

49


* Count of warp, weft & Pile Yarns

* Construction: Warp, weft & Pile

* Terry Ratio : Warp to Pile Length Measurment

* Pile Hight


0.5 mtr

0.5 mtr

0.5 mtr


0.5 mtr


1-2 days

1-2 days

1-2 days


1-2 days


230

130

130


95

Analysis of Yarn

50

* Count

* Count with CV %

* Lea Breaking Strength

* Lea Breaking Strength with CV %

* CSP

* Single Yarn Breaking Strength

* R.K.M.

* Twist & Ply (Per Yarn)

* Number of Filaments


1 cone

1 cone

1 cone

1 cone

1 cone

1 cone

1 cone

1 cone

1 cone


2-3 days

2-3 days

2-3 days

2-3 days

2-3 days

2-3 days

2-3 days

2-3 days




95

190

235

330

375

280

375

155

270

Ecotesting

51

* Determination of Ph Value

* Free Formaldehyde

* Released Formaldehyde

* Chlorine Content

* Banned Amines

* PCP

*Toxicity


0.5 mtr

0.5 mtr

0.5 mtr

0.5 mtr

0.5 mtr

0.5 mtr

0.5 mtr


1-2 days

2-3 days

2-3 days

2-3 days

3-4 days

3-4 days

3-4 days


180

550

700

475

2500

1700

2600


52

Nickel Content (Only)

Lead Content (Only)

Nickel Content & Lead Content (Both)

Nickel Spot Test






5-6 pcs

-


5-6 days

5-6 days

2-3 days

1-2 days


500

500

650

400

 
CMAI - CMAI Lab
CMAI - About The Clothing Manufacturers Association of India
Apparel
Subscribe
Event Calender
Apparel - April 2012
Apparel - March 2012
Apparel - February 2012
Apparel - January 2012
Apparel - December 2011
Apparel - November 2011
Apparel - October 2011
Apparel - September 2011
Apparel - August 2011
Apparel - July 2011
Apparel - June 2011
Apparel - May 2011
Apparel - April 2011
Apparel - March 2011
Apparel - January-February 2011
Apparel - December 2010
Apparel - November 2010
Apparel - October 2010
Apparel - September 2010
Apparel - August 2010
Apparel - July 2010
Apparel - June 2010
Apparel - May 2010
Apparel - April 2010
Apparel - March 2010
Apparel - February 2010
Apparel - January 2010
Apparel - December 2009
Apparel - November 2009
Apparel - October 2009
Apparel - September 2009
Apparel - August 2009
Apparel - July 2009
Apparel - June 2009
Apparel - May 2009
Apparel - April 2009
Apparel - March 2009
Apparel - February 2009
Apparel - January 2009
Apparel - December 2008
Apparel - November 2008
Apparel - October 2008
Apparel - September 2008
Apparel - August 2008
Apparel - July 2008
Apparel - June 2008
Apparel - May 2008
 
CMAI - Link Bottom
Home  |  About CMAI  |  Services Offered  |  News  |  Membership  |  CMAI Lab  |  Fairs & Events  |  Circulars  |  Photo Gallery  |  Contact Us